Graystone Power Cooperative

Graystone Power Cooperative

The Graystone Power Cooperative project in Newnan, Georgia included a 43,956 sq. ft. building completed as a supply and erect project. The building included insulated exterior walls, insulated roof panels, four cranes, and pre-assembled canopies over exterior man doors.

Project Overview

The Graystone Power Cooperative project was completed in Newnan, Georgia, for owner Graystone Electric. Metallic Buildings is listed as the building manufacturer, and the project was completed as a supply and erect project for Super Structures.

The building was 43,956 sq. ft., with the main building listed as over 100 ft. x 431 ft. x 28 ft. at the eave. The exterior walls used 2.5-inch-thick insulated panels, while the roof used 24-inch x 42-inch insulated panels.

The building included four 19-ton cranes, supporting heavy-duty operational needs. All exterior man doors were completed with pre-assembled canopies, adding functional coverage at building access points.

Quick Stats

Related Insights

Gallery

Years in Business
0 +
projects completed
0 +
square feet constructed
0 m+

Featured Projects

gym_01
church
truck_and_thunder
shannon-airport

Ready to Move Your Project Forward?

From preconstruction planning to final closeout, Super Structures brings owner-led accountability to every phase.

Plan Your Build

Plan Your Build