Owner: Graystone Electric
Project Location: Hiram, GA
Building Manufacturer: Metallic Buildings
Supplier and Erector Subcontractor: Super Structures
- Super Structures furnished and erected this 43,964 sf pre-engineered metal building structure.
- The main building was 100’ x 431’ x 31’ eave height. The exterior walls are clad with Mesa 2.5” insulated panels and 2.5” insulated roof panels. The building was fitted out with (4) ten-ton cranes and all the exterior doors included canopies to shelter access and egress to the exterior.